Sterling Ridge Infrastructure – Civil has been a significant player in the heavy civil construction field for in excess of 30 years. The respective founding corporations boast in excess of eighty years of collective experience in heavy civil construction. Sterling Ridge Infrastructure – Civil has the experience, expertise and extensive resources necessary to manage and execute heavy civil construction projects of any magnitude. Our focus has been the construction of roads, bridges, sewers and watermains. Sterling Ridge Infrastructure – Civil is proud to have been a contributing sub-contractor to many large projects including, the Gordie Howe International Bridge – Canadian Point of Entry Surcharge and Concrete Works, the WDBA Hydro One Transmission relocation, the Herb Grey Parkway and the New Brighton Beach Generating Station in Windsor, Ontario.

This image shows a white pickup truck parked on a dirt road in the foreground, with a yellow bulldozer and blue fence in the background.
This image shows a excavator in an outdoor setting, surrounded by trees and houses. The excavator is yellow with black lettering on the side, and it has a large arm extending from its body.
Sterling Ridge Infrastructure Inc. logo with four shades of green diamond

Sterling Ridge Infrastructure – Civil has been a significant player in the heavy civil construction field for in excess of 30 years. The respective founding corporations boast in excess of eighty years of collective experience in heavy civil construction. Sterling Ridge Infrastructure – Civil has the experience, expertise and extensive resources necessary to manage and execute heavy civil construction projects of any magnitude. Our focus has been the construction of roads, bridges, sewers and watermains. Sterling Ridge Infrastructure – Civil is proud to have been a contributing sub-contractor to many large projects including, the Gordie Howe International Bridge – Canadian Point of Entry Surcharge and Concrete Works, the WDBA Hydro One Transmission relocation, the Herb Grey Parkway and the New Brighton Beach Generating Station in Windsor, Ontario.

Civil Division Services

This image shows a large yellow construction vehicle with an excavator scooping up dirt from the ground. The vehicle is parked on a sandy road, and there are tire tracks visible in the foreground.

Heavy Civil

At Sterling-Ridge, we achieve continuous success in the impressive execution of a variety of complex, challenging, and non-conventional heavy civil construction projects. Our services feature collaboration among our group sectors for consistent client convenience and satisfaction.

  • Earthworks

  • Earth and Rock excavation

  • Deep Foundations, Pile driving and sheet Piling

  • Soil stabilization and improvement 

  • Directional Drilling

  • Demolition

  • Waste management facilities

  • Environmental Conservation Infrastructures 

This image shows a construction worker in a safety vest and hard hat working on an outdoor trench. The worker is standing in the middle of the frame, wearing glasses and holding a tool. Behind him is a large yellow excavator with its engine running.

Sewers and Watermains

With dedicated and experienced teams, Sterling-Ridge has installed hundreds of kilometers of linear infrastructure of sewer and watermain systems. Our clients consist of Municipalities, Commercial and Industrial Groups as well as Private Companies and Developers.

  • Water-mains and Sewer construction

  • Open excavation and trenchless pipe installation

  • Concrete structures installation

  • Underground Infrastructure rehabilitation

  • Municipal and Commercial services

  • Utility contracting

This image shows a construction site with a large crane and a man standing next to it. The man is wearing blue overalls, safety glasses, and boots.

Road, Culverts and Bridge Construction

Clients who have complex projects rely on Sterling-Ridge's ability to provide and develop unique solutions. Sterling-Ridge approaches each project with a focus on delivering where others cannot.

  • Cast in Place and Precast concrete structures

  • Temporary Roads and Bridges

  • Road construction and rehabilitation

  • Bridge construction and rehabilitation

  • Earthworks

Civil Division Services


Heavy Civil

At Sterling-Ridge, we achieve continuous success in the impressive execution of a variety of complex, challenging, and non-conventional heavy civil construction projects. Our services feature collaboration among our group sectors for consistent client convenience and satisfaction.

  • Earthworks

  • Earth and Rock excavation

  • Deep Foundations, Pile driving and sheet Piling

  • Soil stabilization and improvement 

  • Directional Drilling

  • Demolition

  • Waste management facilities

  • Environmental Conservation Infrastructures 

Sewers and Watermains

With dedicated and experienced teams, Sterling-Ridge has installed hundreds of kilometers of linear infrastructure of sewer and watermain systems. Our clients consist of Municipalities, Commercial and Industrial Groups as well as Private Companies and Developers.

  • Water-mains and Sewer construction

  • Open excavation and trenchless pipe installation

  • Concrete structures installation

  • Underground Infrastructure rehabilitation

  • Municipal and Commercial services

  • Utility contracting

Road, Culverts and Bridge Construction

Clients who have complex projects rely on Sterling-Ridge's ability to provide and develop unique solutions. Sterling-Ridge approaches each project with a focus on delivering where others cannot.

  • Cast in Place and Precast concrete structures

  • Temporary Roads and Bridges

  • Road construction and rehabilitation

  • Bridge construction and rehabilitation

  • Earthworks

Leisure Lake RV Resort

The video is a time-lapse of the Leisure Lake RV Resort being built, and it's incredible to see the progress that was made in such a short amount of time. The construction crews worked tirelessly, pouring concrete and landscaping the grounds. The resort begins to take shape as the video plays. You can envision the many families who would soon be enjoying the beautiful lake views and relaxing atmosphere.

Leisure Lake RV Resort

Leisure Lake RV Resort


Recent Projects


Recent Projects

This is a picture of a yellow excavator scooping up sand on a construction site.

ENGINEERING FILL AND SURCHARGE PROJECT

  • Sterling Ridge Infrastructure Inc. has been awarded the Engineering Fill and Surcharge Package for the Gordie Howe International Bridge from Bridging North America “BNA”. The main scope is to supply and install more than 750,000 metric tonnes of aggregate material and within the site to install and move more than 850,000 metric tonnes of aggregate material.

    In addition to the aggregate material, instrumentation devices for monitoring the settlement and ground water pressure have been installed and are part of the scope of work. The main activities are occurring at the Canadian Point of Entry “CPOE” for the Gordie Howe International Bridge in Windsor, Ontario.

    In one day, Sterling Ridge Infrastructure Inc. supplied and installed 15,367.40 metric tonnes of aggregate material with more than 70 trailers involved to truck the material from Erie Sand and Gravel in Leamington to the job site at Windsor. Sterling Ridge Infrastructure Inc. also performed 85 compactions tests on the sublots.

    The project team has worked more than 12 hours a day, six days a week with full production and efficiency to put us ahead of critical schedule.

LEGACY BEACON

  • Excavation and backfill for new legacy beacon building, new storm, sanitary and water service work.

SCULLY/ST. MARKS PUMP STATION

  • The project will be a collaborative effort between Sterling Ridge Infrastructure and Sterling Ridge General Contracting. The primary scope of work is as follows:

    • Construction of a new stormwater pump station and Outlet

    • Construction of shoreline protection walls

    • Reconstruction of Storm and Sanitary Sewer, Watermain, Street Light, and Road along Riverside Drive between Grant Avenue and Arlington Boulevard

    • Decommissioning of two existing stormwater pump stations

Client Name: Bridge North America

Duration: 2019-2022

Project Value: + $30 Million

Client Name: Oscar Construction

Duration: May 2023 - May 2024

Project Value: $2.66 Million

Client Name: Town of Tecumseh

Duration: Sept 2023 - July 2025

Project Value: $19.2 Million

In this image, a construction worker wearing a reflective safety vest is seen working on a large pipe in the outdoors. The worker is standing on the ground and is surrounded by a wooden structure with pipes, as well as a large crane with a crane hook

Client Name: City of Windsor

Duration: Sept 2021-July 2022

Project Value: $4 Million

  • •Complete reconstruction of 2 residential blocks

    • Replacement of storm, sanitary sewer mains and services

    • Replacement of watermain and water services

    • Road reconstruction including curbs, sidewalks and driveways

    • Replacement of the street lighting

DOMINION BLVD REHABILITATION

Client Name: City of Windsor

Duration: August 2023 to December 2023

Project Value: $5.5 Million

  • Dominion Boulevard from Northwood Street to Ojibway Street. Storm Sewer, Pavement, Watermain and Street Lighting Rehabilitation.

EASTLAWN AVE. RECONSTRUCTION WYANDOTTE ST. E - EDGAR AVE.

SCULLY/ST. MARKS PUMP STATION

Client Name: Town of Tecumseh

Duration: Sept 2023 - July 2025

Project Value: $19.2 Million

  • The project will be a collaborative effort between Sterling Ridge Infrastructure and Sterling Ridge General Contracting. The primary scope of work is as follows:

    • Construction of a new stormwater pump station and Outlet

    • Construction of shoreline protection walls

    • Reconstruction of Storm and Sanitary Sewer, Watermain, Street Light, and Road along Riverside Drive between Grant Avenue and Arlington Boulevard

    • Decommissioning of two existing stormwater pump stations

ENGINEERING FILL AND SURCHARGE PROJECT

Client Name: Bridge North America

Duration: 2019-2022

Project Value: + $30 Million

  • Sterling Ridge Infrastructure Inc. has been awarded the Engineering Fill and Surcharge Package for the Gordie Howe International Bridge from Bridging North America “BNA”. The main scope is to supply and install more than 750,000 metric tonnes of aggregate material and within the site to install and move more than 850,000 metric tonnes of aggregate material.

    In addition to the aggregate material, instrumentation devices for monitoring the settlement and ground water pressure have been installed and are part of the scope of work. The main activities are occurring at the Canadian Point of Entry “CPOE” for the Gordie Howe International Bridge in Windsor, Ontario.

    In one day, Sterling Ridge Infrastructure Inc. supplied and installed 15,367.40 metric tonnes of aggregate material with more than 70 trailers involved to truck the material from Erie Sand and Gravel in Leamington to the job site at Windsor. Sterling Ridge Infrastructure Inc. also performed 85 compactions tests on the sublots.

    The project team has worked more than 12 hours a day, six days a week with full production and efficiency to put us ahead of critical schedule.

LEGACY BEACON

Client Name: Oscar Construction

Duration: May 2023 - May 2024

Project Value: $2.66 Million

  • Excavation and backfill for new legacy beacon building, new storm, sanitary and water service work.

EASTLAWN AVE. RECONSTRUCTION WYANDOTTE ST. E - EDGAR AVE.

Client Name: City of Windsor

Duration: Sept 2021-July 2022

Project Value: $4 Million

  • •Complete reconstruction of 2 residential blocks

    • Replacement of storm, sanitary sewer mains and services

    • Replacement of watermain and water services

    • Road reconstruction including curbs, sidewalks and driveways